Look: Library Building's finishing touches
The UM Library Project Management Team, with UM President and Chair Dr. Guillermo P. Torres, inspected the on-going construction of the library building in the Matina-Maa Campus.
The library, with a total floor area of 13,000 square meters (1.3 hectares), will soon to be the biggest in Mindanao. It is expected to have its inauguration in the first half of 2023.
View more here.