The UM Library Project Management Team, with UM P...
2023-02-18
Look: Library Building's finishing touches
The UM Library Project Management Team, with UM President and Chair Dr. Guillermo P. Torres, inspected the on-going construction of the library building in the Matina-Maa Campus.
The library, with a total floor area of 13,000 square meters (1.3 hectares), will soon to be the biggest in Mindanao. It is expected to have its inauguration in the first half of 2023.